Front view-April 26, 2012
-
-
April 26, 2012
-
-
April 12, 2012 – Finishing exterior
-
-
March 6th, 2012
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Bishop Etienne starts the excavation
-
-
Farish shows us how to start a new church
-
-
Farish shows us how to get the new church started
-
-
Bishop Etienne breaks ground on May 18th, 2011
-
-
Bishop Etienne breaks ground on May 18th, 2011
-
-
July 7th, 2011. Preparing to form and pour stem walls and slab.
-
-
July 7th, 2011. Preparing to form and pour stem walls and slab
-
-
July 7th, preparing to form stem walls and pour slab
-
-
Construction of new church on June 28, 2011
-
-
July 20 – lower level view with parish hall in background, entryway to the right and sanctuary to the left
-
-
Lower level view-parish in background – entryway to the left and sanctuary to the right
-
-
Lower level framing on July 14th
-
-
Lower level framing – 14 July 2011
-
-
Ready to pour slab on 14 July
-
-
July 20, lower level with entryway in the background.
-
-
July 20, sanctuary area with septic installation in background
-
-
July 20, lower level view with hall in the background, entryway to the left and sanctuary to the right.
-
-
July 20, lower level with sanctuary in the background
-
-
July 20, Sanctuary view, septic tank excavation in the background
-
-
July 20, lower level view with hall in the background, entryway to the left and sanctuary to the right.
-
-
July 20, lower level with hall in the background, entryway to the left and sanctuary to the right.
-
-
July 26 – bearing walls being installed prior to floor joists and decking work.
-
-
July 26 – lower level bearing walls being installed prior to floor joists and decking work.
-
-
August 5th-Decking in place, ready to start the walls